Indisponible en français

Résumé Preview

This document establishes requirements for pumping tests as part of geotechnical investigation service in accordance with EN 1997-1 and EN 1997-2.

This document applies to pumping tests performed on aquifers whose permeability is such that pumping from a well can create a lowering of the piezometric head within hours or days depending on the ground conditions and the purpose. It covers pumping tests carried out in soils and rock.

The tests concerned by this document are those intended for evaluating the hydrodynamic parameters of an aquifer and well parameters, such as:

— permeability of the aquifer,

— radius of influence of pumping,

— pumping rate of a well,

— response of drawdown in an aquifer during pumping,

— skin effect,

— well storage,

— response of recovery in an aquifer after pumping.


Informations générales

  • État actuel :  Publiée
    Date de publication : 2021-03
  • Edition : 2
  • :
    ISO/TC 182
    Géotechnique
  • 93.020
    Travaux de terrassement. Excavation. Fondation. Travaux en souterrain

Acheter cette norme

Format Langue
PDF + ePub
Papier
  • CHF138

Vous avez une question?

Consulter notre FAQ

Service à la clientèle
+41 22 749 08 88

Horaires d’ouverture:
De lundi à vendredi - 09:00-12:00, 14:00-17:00 (UTC+1)

Suivez l'actualité de l'ISO

Inscrivez-vous à notre Newsletter (en anglais) pour suivre nos actualités, points de vue et informations sur nos produits.