Indisponible en français

Résumé Preview

This document provides definitions, guidelines and supporting information for evaluating and reporting (with respect to the basic design items ongoing, and the operational results of a reference plant or unit as feedback) to ensure the (designed) performance of a PCC plant integrated with a host power plant. The PCC plant separates CO2 from the power plant flue gas in preparation for subsequent transportation and geological storage. The physical system being addressed is a single power plant, with an optional auxiliary unit to provide thermal energy required for the PCC plant, and a single PCC plant as described in ISO 27919-1.

The formulas and methods to assure and maintain reliable performance, presented in this document, describe issues addressed during the design and construction phases and practices that document reliability and availability during routine operation. These practices would also guide ongoing maintenance programmes.

This document does not provide guidelines for benchmark, comparison or assessment studies for PCC plant operations using different capture technologies (i.e. absorbents), nor does it specify appropriate operating conditions such as temperature etc.


Informations générales

  • État actuel :  Publiée
    Date de publication : 2021-09
  • Edition : 1
  • :
    ISO/TC 265
    Captage du dioxyde de carbone, transport et stockage géologique
  • 13.020.40
    Pollution, maîtrise de la pollution et protection de l'environnement

Acheter cette norme

Format Langue
PDF + ePub
Papier
  • CHF178

Vous avez une question?

Consulter notre FAQ

Service à la clientèle
+41 22 749 08 88

Horaires d’ouverture:
De lundi à vendredi - 09:00-12:00, 14:00-17:00 (UTC+1)

Suivez l'actualité de l'ISO

Inscrivez-vous à notre Newsletter (en anglais) pour suivre nos actualités, points de vue et informations sur nos produits.